Skip to content

Case study

Kukatpally terrace heat and hairline cracks

Top-floor rooms unlivable in May; hairline terrace cracks after summer.

Heat-reflective roof coating in Kukatpally, Hyderabad
  • Hot top-floor rooms
  • Hairline terrace cracks reopening each summer

Problem

Top-floor rooms unlivable in May; hairline terrace cracks after summer.

Inspection

Crack map and slope check. Thermal used to confirm no hidden wet pockets before coating.

Evidence

Dry hairline cracks, no active wet path on the scan. Ponding at one outlet.

Diagnosis — Confirmed

Thermal movement cracks plus poor outlet; not an active pipe leak.

Treatment

Crack treatment, outlet clear, heat-reflective coat.

Testing

Visual after first rain; outlet flow check.

Warranty quoted

Quoted 5-year roof coat. Garden planters added later would void the coat at those points.

Same method on your building

Book an inspection. You get the diagnostic report before any coating is sold.