Problem · the last job did not hold

Failed waterproofing in Hyderabad

If waterproofing failed, coating it again is how you buy the same leak twice. We inspect what was skipped: joints, outlets, substrate, chemistry, testing. The second job has to be a different scope, not a second bucket.

What you are seeing

Symptoms and likely causes

Typical signs

  • A leak that returned one monsoon after “complete waterproofing”
  • Warranty from the last contractor that nobody answers
  • Ponding still visible on a “done” terrace
  • You were told the stain would dry on its own

Causes we actually check

  • Membrane over untreated cracks or a blocked outlet
  • Wrong chemistry — rigid coat on a moving Hyderabad terrace
  • Joints and penetrations never detailed
  • No pond or shower test at handover

How Gracia diagnoses

Evidence before treatment

We treat failed work as a new diagnosis, not a complaint about a brand. Photos of the old system, thermal if the path is hidden, then a scope that names what the last quote left out. We do not warrant someone else’s coat by painting over it.

HITEC City commercial roof in our case library had two previous coatings over untreated HVAC kerbs. The polyurea job started at those joints. That is the pattern we look for on failed terraces across the city.

Confirmed

Multiple evidence points support the cause.

Probable

Evidence indicates the cause; further verification may still be required.

Possible

One or more clues exist, but the evidence is not enough for a firm conclusion.

Excluded

Inspected, and no supporting evidence found in the inspected area.

What the Leak Diagnostic Report contains → · Thermal diagnosis cluster

Local case

HITEC City commercial roof — polyurea system

Commercial polyurea roof waterproofing in HITEC City

Problem. Repeated monsoon leaks into a commercial top floor despite two previous coatings.

Evidence. Failures clustered at HVAC kerbs and expansion joints, not the field of the old coat.

Confirmed. Untreated penetrations and joints under a coating that had been applied over them.

Treatment. Joint and kerb detailing, then specified polyurea system.

Testing. Pond test on bays that hold water; leak watch on the floor below.

Full case study →

Questions

About this problem

Usually because the source was not treated — a joint, a trap, ponding, or a pipe. Recoating the stain does not change the path. Inspection of the failure is the first day of the new job.

Next

People also look for

Need this diagnosed, not guessed?